| Arrangements were made to close a London street
on a weekend so that a crane could be used to lift the boilers and
water heaters we were delivering.
We
arrived at the designated time so the job could be done. A four
figure penalty for holding things up was avoided.
Precision timed deliveries like this are now a regular
occurrence for us.
|